Monday, July 26, 2010


draining the swamp

pouring the footing

the peanut gallery

Thursday, July 22, 2010


Checking the ramp
spreading the fill
starting the layout for the footings
just about done with the layout

Tuesday, July 20, 2010


still putting in the catch basins

painting the trailers

Monday, July 19, 2010



putting in the drainage system


Wednesday, July 14, 2010

stripping the curb forms



and pouring the sidewalk


Tuesday, July 13, 2010

more curbing










Wednesday, July 7, 2010

getting ready for the next curbs

Monday, July 5, 2010

moving the guy wires
last of the bank

it was a brutally hot day
to be pouring concrete.
it tooks its toll on all of us

Friday, July 2, 2010

help I need a push
sinking fast

checking the compaction of the gravel

checking the specs for the sidewalk

Thursday, July 1, 2010

where is that #?@# concrete
dumping the excess soil

more cribbing for the curbs

getting ready for the curbs