Howe Drive 2010
A New Beginning
Monday, July 26, 2010
draining the swamp
pouring the footing
the peanut gallery
Thursday, July 22, 2010
Checking the ramp
spreading the fill
starting the layout for the footings
just about done with the layout
Tuesday, July 20, 2010
still putting in the catch basins
painting the trailers
Monday, July 19, 2010
putting in the drainage system
Wednesday, July 14, 2010
stripping the curb forms
and pouring the sidewalk
Tuesday, July 13, 2010
more curbing
Wednesday, July 7, 2010
getting ready for the next curbs
Monday, July 5, 2010
moving the guy wires
last of the bank
it was a brutally hot day
to be pouring concrete.
it tooks its toll on all of us
Friday, July 2, 2010
help I need a push
sinking fast
checking the compaction of the gravel
checking the specs for the sidewalk
Thursday, July 1, 2010
where is that #?@# concrete
dumping the excess soil
more cribbing for the curbs
getting ready for the curbs
Newer Posts
Older Posts
Home
Subscribe to:
Posts (Atom)